Steam-ready rough-in only
Membrane, sloped ceiling and pipe and power stubbed for a generator to add later.
Best for
Hedging for later.
Why people pick it
- Lower cost now
- Adds later without demolition
What to watch
- Glass may need changing later
What it changes
Rough-in before tile.
How it rates
- Looks and feel
- Lifetime cost (5 is lowest)
- Durability and upkeep
- Moisture safety
- Ease for local crews