Helical steel piles
Steel shafts with screw-like plates, turned into the ground with a hydraulic driver and capped with beams. Little digging, no curing, and less concrete than drilled piers.
Best for
Tight or hard-to-reach lots where a drill rig can't get in, with an engineer who knows the system.
Why people pick it
- Installed in a day or two with small equipment
- Each pile's capacity is checked from installation torque
- Less concrete and less soil to haul
What to watch
- Earthquake (sideways) loads need careful engineering
- Fewer local engineers specify them
- Corrosive soils need coated steel
What it changes
Needs an engineer comfortable with helical design, an evaluation report for the product, and a soil corrosion test.
Pick it if
The lot is tight and a drill rig can't get in.
How it rates
- Lifetime cost (5 is lowest)
- Comfort and energy bills
- Durability and upkeep
- Structure and seismic
- Moisture safety
- Fire and wildfire
- Ease for local crews
- Lower carbon
Brands to know
- Hubbell CHANCE
- Ram Jack
- Magnum Piering