Post-tensioned slab

Foundation typeMid cost

A slab with steel cables pulled tight after the pour, so it acts as one stiff plate. Engineers specify it on expansive or uneven soils.

Best for

Flat or gently sloped lots on expansive clay where a plain slab would crack.

Why people pick it

  • Resists cracking and movement on clay
  • Thinner for the same stiffness
  • Specialist installers work in most regions

What to watch

  • Never drill without scanning for cables
  • Needs a specialist sub and engineer inspection
  • Same cast-in plumbing trade-off as any slab

What it changes

Plumbing and floor penetrations must be final before the pour. Future remodels need scanning before drilling.

Pick it if

The soils report finds swelling clay on a flat lot.

How it rates